The Crawfordsville Airport project consisted of constructing a new, 4,200 square foot terminal building. The Nucor pre-engineered metal building (PEMB) also includes 1,000 square feet of veranda/observation area. The new terminal was built on the original terminal site, which was a small farmhouse purchased along with the property in 1944.